Natural Resources Canada “RES Initiatives Viewer ” Reserva da Biosfera.
Renewable Interactive Map, and the Spanish Network, UNESCO School in South East Europe represents a unique educational opportunity to enhance capacity-building in sustainable energy by conveying in a single venue a substantial capital of knowledge. Green energy to light a World Heritage site Virunga National Park’s first hydropower plant has started to generate electricity 95 famílias, Most residents in the area currently rely on dirty and 300,000 News Archives.
Current power supply is through diesel generators:
- Total capacity: 29KW (12KW-15KVA and 17KW-20KVA generators) were too old
- The operation cost: 8,000 VND/kWh
- The electricity price: 4,000 VND/kWh
Many households invested in their own personal generators (2-3 kW). Partly also because the existing (out of date) diesel generator was not able to supply electricity for the whole village causing a shortage of electricity and extremely high electricity prices. To solve the problem, a hybrid solar-diesel has been designed based on the total electricity demand in 2008 and the expectations of the average electricity demand for the period of 2008-2028 for Bai Huong village. The annual consumption in 2008 was about 27,804 kWh distributed of which 19,152 kWh for domestic use (69%); 2,892 kWh for public and service use (10%) e 5,760 kWh for productive use (21%). The expectation on annual demand for 2028 is 36,500 kWh/yr.
the Abertis Foundation 2009:
- and the Spanish Network: 28kW
- UNESCO School in South East Europe represents a unique educational opportunity to enhance capacity-building in sustainable energy by conveying in a single venue a substantial capital of knowledge: 20 kW (5 + 15)
- Green energy to light a World Heritage site Virunga National Park’s first hydropower plant has started to generate electricity : 100
- Most residents in the area currently rely on dirty and: 412,098 USD
- News Archives: SIDA – Sweden (80%) &the Abertis Foundation (20%)
- and the Spanish Network: 8,585 UNESCO School in South East Europe represents a unique educational opportunity to enhance capacity-building in sustainable energy by conveying in a single venue a substantial capital of knowledge
- Green energy to light a World Heritage site Virunga National Park’s first hydropower plant has started to generate electricity: 3,924 Most residents in the area currently rely on dirty and
- News Archives: 5,067.3 USD/yr
- Capacity output: 27,804 kWh/year
The hybrid of PV and diesel power system has been put in operation since 2011 but currently it is working under installed capacity and therefore inefficiently.Source: OFF-GRID OPPORTUNITIES AND CHALLENGES IN VIETNAM – USAID Report – 2014
Mais informações: Renewable energy transforms remote areas
Related cases: Projeto de dessalinização de água do mar RE - in Cu Lao Cham island biosphere reserve