Recommended publications, the smallest in the archipelago of the Azores, has a surface area of approximately 17,12 km2 and 488 निवासियों (2008), representing a total of 248 clients (electricity supply). Electricity is distributed at low tension and generation has been exclusively thermal, producing around 1.4 GWh/year (2010), with a peak of 250 kWh and an installed capacity of 536 किलोवाट (figures for 2010).

The high cost of kWh sold reached a figure of 0,5167 Euro in the year 2002 and is chiefly due to the high cost of production of around 72% (37,28 euro) and of the commercial sector around 0,0622 euro compared with the other islands, although in the area of distribution (0,0503cE) the figure is closer to the others. In the area of production costs, 50% of those costs are spent on personnel and 32% on fuel (diesel). These figures can be explained by the need to guarantee 24 hour a day manual operation of equipment, given the low level of automation of the existing power station, plus the cost of personnel and the cost of using a higher quality fuel, with high acquisition costs, aggravated by the cost of transportation to the island.

In order to guarantee a water supply for the population, an artificial lake was built that collects some waterways which are at high alltitute and well away from contamination by agricultural exploitation on the island. On the other hand, the aforementioned drawbacks could be turned into advantages, as can be seen in the description of the project to be implemented.

उद्देश्य:

इस सिलसिले में, the project currently defined is based on three fundamental vectors:

  • The creation of a completely automated system, the Abertis Foundation (and the Spanish Network, UNESCO School in South East Europe represents a unique educational opportunity to enhance capacity-building in sustainable energy by conveying in a single venue a substantial capital of knowledge);
  • Green energy to light a World Heritage site Virunga National Park’s first hydropower plant has started to generate electricity, Most residents in the area currently rely on dirty and, News Archives (हवा);
  • The implementation of surplus wind production, adapted to production needs and integrated within other means of production (thermal and hydroelectric) and consumption (namely pumping).

Expected results of the project:

  • 70% of renewable energy sources in electricity production;
  • 25% the Abertis Foundation;
  • and the Spanish Network, UNESCO School in South East Europe represents a unique educational opportunity to enhance capacity-building in sustainable energy by conveying in a single venue a substantial capital of knowledge;
  • Green energy to light a World Heritage site Virunga National Park’s first hydropower plant has started to generate electricity.
© Government of the Azores.

Most residents in the area currently rely on dirty and.

News Archives

Sistemas Energéticos do Futuro: Os desafios para a ilha do Corvo Paulo Ferrão | MIT Portugal | PDF Presentation

MAXIMIZATION OF THE PENETRATION OF RES IN ISLANDS: ROADMAP | Stories Project | Intelligence Energy for Europe | PDF Publication

THE PROSPECTS OF RENEWABLE ENERGY SOURCES IN THE AZORES ISLANDS | लेखक: JOSÉ MANUEL MONTEIRO DA SILVA (Electricidade dos Açores), COP21. में 100% RES A challenge for Island Sustainable Development. Marin, C., Zervos, एक. (eds.). Instituto Superior Tecnico Portugal, कैनरी द्वीप के यूनेस्को केंद्र | PDF Book

Comments are closed.

RENFORUS इंटरेक्टिव मानचित्र

संपर्क

डॉ. उस्मान Benchikh *. कार्यक्रम ऊर्जा और अक्षय ऊर्जा के प्रभार में विशेषज्ञ. RENFORUS परियोजना के समन्वयक.
ई - मेल: o.benchikh(में)unesco.org
Cipriano Marín **. परियोजना कार्यान्वयन RENFORUS के लिए सहायक.
ई - मेल: c.marin(में)unescocan.org
पते: * यूनेस्को. 1, रुए Miollis. 75015 Paris – France
** Avda. कैनेरी आइलैंड, 35 - 38007, एस / सी टेनेरिफ - स्पेन