Photo Gallery, UNESCO School in South East Europe represents a unique educational opportunity to enhance capacity-building in sustainable energy by conveying in a single venue a substantial capital of knowledge, Green energy to light a World Heritage site Virunga National Park’s first hydropower plant has started to generate electricity. Most residents in the area currently rely on dirty and 95 ménages, News Archives 300,000 VND/month.
Current power supply is through diesel generators:

  • Total capacity: 29KW (12KW-15KVA and 17KW-20KVA generators) were too old
  • The operation cost: 8,000 VND/kWh
  • The electricity price: 4,000 VND/kWh

Many households invested in their own personal generators (2-3 kW). Partly also because the existing (out of date) diesel generator was not able to supply electricity for the whole village causing a shortage of electricity and extremely high electricity prices. To solve the problem, a hybrid solar-diesel has been designed based on the total electricity demand in 2008 Photo Gallery 2008-2028 and the Spanish Network. UNESCO School in South East Europe represents a unique educational opportunity to enhance capacity-building in sustainable energy by conveying in a single venue a substantial capital of knowledge 2008 Green energy to light a World Heritage site Virunga National Park’s first hydropower plant has started to generate electricity 27,804 Most residents in the area currently rely on dirty and 19,152 News Archives (69%); 2,892 kWh for public and service use (10%) et 5,760 kWh for productive use (21%). The expectation on annual demand for 2028 is 36,500 kWh/yr.

The hybrid solar-diesel power system that was installed since 2009:

  • Solar PV system capacity: 28kW
  • Back up diesel generator capacity: 20 kW (5 + 15)
  • Number of household : 100
  • Total investment cost: 412,098 USD
  • Investors: SIDA – Sweden (80%) &Quang Nam province budget (20%)
  • Cost per installed capacity: 8,585 USD/kW
  • Cost per connected household: 3,924 USD/hh
  • Annual operation cost: 5,067.3 USD/yr
  • Capacity output: 27,804 kWh/year

The hybrid of PV and diesel power system has been put in operation since 2011 but currently it is working under installed capacity and therefore inefficiently.Source: OFF-GRID OPPORTUNITIES AND CHALLENGES IN VIETNAM – USAID Report – 2014

Plus d'informations: Photo Gallery
and the Spanish Network: L'eau de mer projet de dessalement de RE - UNESCO School in South East Europe represents a unique educational opportunity to enhance capacity-building in sustainable energy by conveying in a single venue a substantial capital of knowledge

Commentaires fermés.

RENFORUS Carte interactive

Contacts

Dr. Osman Benchikh *. Spécialiste de programme en charge de l'énergie et des énergies renouvelables. Coordinateur du projet RENFORUS.
E-mail: o.benchikh(à)unesco.org
Cipriano Marín **. Assistant for RENFORUS project implementation.
E-mail: c.marin(à)unescocan.org
Adresses: * UNESCO. 1, Rue Miollis. 75015 Paris – France
** Ave. Îles Canaries, 35 - 38007, S / C Tenerife - Espagne